1. Capture the actual designation
Begin by photographing and transcribing every printed marking on the jacket. Record the full manufacturer part number and any TC, TC-ER, PLTC or other designation exactly as printed. Do not infer Type from where the cable was mounted; use the jacket designation and supporting manufacturer records as primary evidence.
Required evidence fields for this step: jacket designation, manufacturer/part number, voltage marking and a clear photo reference tied to the recorded reel or removed length.
- Photo both sides of the jacket text and include a ruler or reference object.
- Assign a unique line or reel ID and attach the photo reference to that ID.
2. Split specification variants into separate lines
Use separate inventory lines for items that differ in conductor count, pair count, gauge, shielding, or jacket construction. Two reels that look similar can represent different designs; keep them separate until the recorded evidence shows they are identical.
When shielding is unknown, note that explicitly and keep the item as a distinct line marked 'shielding unknown' until further inspection or manufacturer documentation resolves it.
- Evidence fields: conductor count, pair count, gauge, shielding, jacket.
- If partial reels or cut lengths exist with mixed constructions, document each length as its own line with continuous footage and condition.
3. Document each remaining piece and quantity basis
Record continuous footage and whether a length is full, partial or cut. Note fitted ends, measured footage and whether values are measured, documented or estimated. For every reel or removed length, capture: line/reel ID, continuous footage, condition and fitted ends.
If footage is estimated, state the method used and attach photos that show any length markings or remaining reel tags.
- Evidence fields: line/reel ID, continuous footage, condition, fitted ends, measured/documented/estimated.
- Label each photographed item with the same line/reel ID used in the record.
4. Match records, describe service history and release details
Attach matching data sheets, purchase or project records where available. Describe service history (known service dates and locations) and identify owner, release authority and any access or location limits for inspection or pickup.
Required supporting evidence: matching documents, unused/removed status, service history, owner/release authority and access details. Keep an unknown designation separate until documentary evidence supports reclassification.
The city planning record supplies restrained local context: The West Anchorage District Plan identifies electricity, solid waste, telecommunications, recycling, water and wastewater as public utilities and discusses utility corridors and industrial-area sewer capacity. It does not identify a control-cable source or customer. Its practical relevance is to keep cable records separate from unrelated facility inventory and release paperwork.
- Evidence fields: matching documents, unused/removed status, service history, owner/release authority, access.
- If the owner is unknown or release authority is unresolved, flag the line and do not combine it with other lines.
5. What to do with unknown or incomplete inventory
When markings, manufacturer numbers or shielding are missing or illegible, record the item as 'designation unknown' and keep it as a separate inventory line. Provide high-resolution photos and any partial markings you can read; these support future matching to manufacturer records.
If footage or shielding is estimated, clearly mark the estimate method. Do not merge an unknown-designation item with validated lines; resolution requires jacket evidence or manufacturer confirmation.
- Keep unknown-designation lines labeled and attach all photos and notes so they can be re-evaluated if better evidence appears.
- Flag items where release authority or ownership remains unresolved so a follow-up can obtain permissions or documents.
6. How we use your submission
We review the attached photos, markings and documentation to determine whether items can be grouped. Our internal decision follows the steps above: prioritize jacket designations and manufacturer part numbers, then confirm electrical construction details such as conductor count and shielding before combining lines.
If critical evidence is missing we will request additional photos, manufacturer datasheets or an inspection. Keep in mind whether specific control/tray construction and removed condition are accepted needs business confirmation; include that request in your submission when relevant.
- Provide all required evidence fields in the brief to speed review.
- If you need to know whether a particular construction will be accepted, explicitly request lot-specific confirmation in your submission.