Replace project shorthand with a reel-level record
Create a row for each reel or continuous piece. Transcribe manufacturer designation, conductor material and size, marked voltage, and reel ID from the tag or jacket. An underground project name may explain why cable is available, but it does not identify the construction, rating, or remaining footage of every reel in a handoff.
The likely mistake is a single aggregate line that treats all underground project cable as one construction. Correct it by splitting reels when their designation, conductor, neutral, shield, quantity, or condition differs. A missing tag should produce an unknown field and supporting photographs, not a guessed product name.
- Use one row per reel or continuous piece and retain the physical reel ID.
- Record manufacturer designation, conductor material and size, and marked voltage exactly as supported.
- Keep unreadable or absent details visibly unknown.
Carry the full assembly and handling record through the handoff
For each reel, record neutral, shield, and other configuration fields from matching records. Keep continuous footage, quantity basis, dimensions, gross or net weight basis, and exposed-end condition with the same line. An aggregate project ticket should not redistribute its quantity or configuration across reels whose identities have not been reconciled.
Release information also belongs at reel or site level: storage ZIP or address through the quote process, release authority, available loading equipment, and access limits. If a role or equipment detail is pending, state pending or unknown. This allows the physical inventory and its release status to remain separate from a project shorthand label.
- Record neutral, shield, configuration, and matching-record reference for each assembly.
- Add per-reel footage, dimensions, weight basis, and end condition.
- Identify release authority, loading equipment, and site limits without assuming a movement arrangement.
Use the local fact only to frame accurate distribution records
TEP’s Midtown Reliability Project includes a new higher-voltage transmission line, a new substation and other upgrades in central Tucson; its project description includes a 138 kV loop and replacement of aging 4 kV facilities with 13.8 kV distribution lines, poles, transformers and switchgear.
The statement is limited Tucson context for rating-specific distribution documentation. It neither identifies a reel from the project nor represents a purchase commitment. The seller task remains to preserve an actual reel’s marked rating and configuration through the inventory handoff rather than applying a project-level description to it.
- Keep project documents marked as project-level unless tied to a specific reel.
- Do not infer neutral, shield, or voltage details from the project title.
- List a matching record reference only when it connects to the offered reel.
Correct an aggregate distribution-cable line
Illustrative inventory example—not a purchased lot: UD-TUS-06 is one warehouse reel with distribution designation from its tag, conductor size documented, and 580 ft documented. Neutral is pending, shield is documented, the gross weight includes packaging, and loading equipment is unknown. The record keeps each known field tied to the one reel and names the remaining gaps.
A corrected submission lists one row per matching specification or continuous piece, adds photo filenames to the appropriate reel ID, and shows whether footage and weight are documented or estimated. That record is useful even with gaps because it does not silently convert an aggregate project record into a uniform product description.
- Required evidence: designation, rating, conductor details, assembly configuration, and reel ID.
- Add length, quantity basis, handling details, release authority, and access limits.
- Use pending or unknown for unresolved configuration, equipment, or release fields.