Create a construction card for each reel family
An underground project name is not a cable construction. Start with actual reel tag, jacket legend, and matched product record. Record designation, conductor material and size, marked voltage, and neutral, shield, or other configuration details exactly as documented. A generic distribution label should not replace a reel-specific construction record.
If several reels appear similar, do not assume they match until their marking and construction fields are compared. A missing neutral or shield detail belongs in an unknown field, not in a guessed product description based on a neighboring reel or intended application.
- Transcribe designation, conductor material and size, and marked voltage.
- Keep neutral, shield, and configuration in their own field.
- Use unknown for construction gaps.
Keep quantity tied to the physical reel
Give every reel an ID and record continuous footage with the basis shown as measured, documented, estimated, or unknown. State the count of genuinely matching reels only after product fields agree. A project total is context, not a length that should be copied into every reel row.
The typical mistake is treating all underground project cable as one uniform construction and applying project total to each reel. Fix it by splitting lines by documented product and retaining reel-specific footage even when several reels are summarized later.
- Record reel ID and continuous footage on every row.
- Label footage basis explicitly.
- Count matching reels only after construction fields align.
Describe end protection and storage without fitness claims
Record whether cable is uninstalled or removed, known storage setting, end protection, and visible observations such as exposed ends, degraded wrapping, or flange damage. A photograph can show these facts, but it does not prove electrical performance. Keep storage and end facts with the same reel reference as construction record.
Where history is incomplete, write unknown and capture observable condition. Do not use a clean outer jacket or generic project description to replace missing end or exposure information. An accurate gap is better than an unsupported condition statement.
- State indoor, outdoor, covered, or unknown storage setting.
- Record end caps, bands, sealed ends, or unknown.
- List visible observations without performance conclusions.
Preserve handoff and site fields
Add actual location, business role that can confirm release, reel dimensions, gross, net, or unknown weight basis, and seller-reported access limitations. These are handoff fields for the specific lot. They do not create a transport arrangement or replace cable construction details.
If weight or loading context is not documented, leave it unknown and provide reel dimensions or photographs when available. Do not use terminal capacities, project totals, or another reel’s data as a stand-in for the item being described.
- Keep location, release status, and access limits with reel line.
- State the weight basis or unknown.
- Record dimensions only when observed or documented.
Review a fictional distribution-cable record
Illustrative fictional inventory record—not a purchased lot: UD-LR-01 has a distribution designation copied from its tag, 580 feet documented, warehouse storage, and end protection present. Its neutral configuration is pending confirmation and listed weight is gross weight including packaging.
The record is useful because it does not pretend pending neutral detail is known. It preserves specific reel, amount, storage observation, and quantity basis while showing the construction field that needs follow-up before the line is described more narrowly.
- Do not copy project total into UD-LR-01.
- Keep pending neutral details explicit.
- Label gross weight as including packaging when that is all the record supports.