What this listing asks you to provide
This page focuses on documenting an aluminum feeder assembly so a buyer can decide without relying on visual appearance alone. Start with the product record: transcribe the reel tag, manufacturer designation and any conductor-metal statement exactly as printed. If the records don’t explicitly establish conductor metal, mark it unconfirmed rather than assuming aluminum from a silvery surface.
Next preserve assembly details from labels and documentation: note conductor count, any neutral, shield or support member and insulation designation. Record marked voltage or other product markings instead of estimating from outside diameter.
Finally reconcile the remaining stock by listing continuous lengths and indicating whether each figure is measured, documented or estimated. Describe reel and exposed-end condition and identify who controls release and what loading access exists.
The City of Berkeley capital-project index lists facility, sewer, street, transportation and other-infrastructure projects with statuses including planning, design, construction and completed. That index is local project context, not proof that any listed project has aluminum feeder cable for sale. It supports using a reel-level record when a contractor or facility offers documented leftover cable.
- Transcribe reel tag and manufacturer designation verbatim.
- Record conductor count, neutral/shield/support, insulation and marked voltage from matching records.
- List reel ID, continuous length (measured/documented/estimated), quantity basis and end/reel condition.
- Group lots by storage site and state release authority and loading access.
Step 1 — Transcribe the product record
Copy the reel tag, part number and any conductor-metal statement exactly. Use the evidence fields manufacturer, part number/designation, conductor metal source and AWG/kcmil to collect what the record says. If you cannot find a clear conductor-metal statement on the tag, jacket printing or paperwork, record “metal unconfirmed.”
Why this matters: a silvery exposed conductor can be aluminum but might also be a tinned copper, plated component or an aluminum support member in a mixed assembly. The reel record is the primary source for identification; appearance is a secondary cue only.
- Evidence to copy: manufacturer; part number/designation; conductor metal source; AWG/kcmil.
Step 2 — Preserve assembly details
Do not infer neutral, shield or support members from overall diameter. Use jacket printing, reel tags and matching product literature to fill the fields conductor count, neutral/shield/support and insulation designation. If documentation confirms a neutral or braided support, record it; if it does not, mark that aspect unconfirmed.
Include marked voltage as listed on the product markings; voltage can indicate intended insulation and assembly construction.
- Evidence to collect: conductor count; neutral/shield/support; insulation designation; marked voltage.
Step 3 — Reconcile remaining stock and lengths
List each continuous length and state whether it is measured, documented in records, or estimated from visible footage. Provide reel ID, continuous length and the quantity basis. Describe any exposed ends (cut, tinned, lugs removed) and overall reel condition (partial, full, wooden reel, damaged flange).
If precise dimensions or weights are unavailable, describe only the observed access conditions and leave the missing measurement unknown. That information supports a lot-specific handling discussion without establishing transport, freight, inspection or acceptance terms.
- Evidence to collect: reel ID; continuous length; quantity basis; end/reel condition.
- If partially consumed, state estimated footage and how the estimate was derived.
Step 4 — Document release, access and loading
Group lots by storage location and state who can authorize release. Provide dimensions and a gross/net weight basis if available, and describe loading access or restrictions (gate hours, forklift availability, overhead clearance limitations). If you don’t control release, name the release authority and give contact instructions.
Indicate which conductors are explicitly identified on the reel tag or jacket printing and which observations are visual only. A reviewer can then see the boundary of the record without treating a visual observation as a complete cable specification or a test result.
- Evidence to collect: storage location; release authority; dimensions; gross/net weight basis; loading access.
How to handle unknowns and mixed construction
If records show mixed construction or you cannot confirm conductor metal for every conductor in an assembly, preserve that uncertainty in the listing: mark affected fields unconfirmed and describe which elements are confirmed and which are not. Do not convert a silvery exposed conductor into a blanket specification for every conductor in the bundle.
Example guidance: indicate which conductors are explicitly identified on the reel tag or jacket printing and note any conductors that were inspected visually only. Buyers will request additional inspection or lab verification if required; your role is documentation, not testing.
- Keep ambiguous fields labeled as unconfirmed.
- Describe exactly what records say and what was visually observed, separately.
