Record distribution construction from the reel or matching file
Create a separate row for each designation and copy conductor metal and size, marked voltage, and neutral, shield, or other configuration detail from the reel or an expressly matching record. A project category such as underground work does not make different reels a uniform construction.
Where a neutral or shield field is not readable, write unknown. Keep that reel separate from a line with confirmed construction. The purpose is to preserve the evidence trail through a project-to-warehouse handoff, not to assign a more complete label than the record supports.
- Actual designation
- Conductor metal and size
- Marked voltage
- Neutral, shield, or configuration detail
Keep quantity and weight basis at reel level
List continuous footage, reel dimensions, and the basis for every weight number. Distinguish gross loaded-reel weight, cable weight, conductor weight, and any estimate; those measures answer different questions and should not be substituted for one another.
A large reel should not be reported as one undifferentiated total. If length is documented but weight is estimated, preserve both labels. When a reel has a partial length or uncertain count, put the uncertainty beside its own reference rather than in a general note.
- Reel ID
- Continuous footage and its basis
- Reel dimensions
- Gross, cable, conductor, or estimated weight basis
Match the physical reel to the handoff record
Link the project, warehouse, or transfer record to the physical reel with matching ID, photographs, and any readable label. Add exposed-end condition, missing protection, visible jacket observations, and known storage exposure. These fields document the handoff without claiming a condition that is not recorded.
If an inventory export describes several reels but cannot be matched to one physical item, record it as unresolved. Do not use the project name to bridge a missing physical match. A focused row with an unknown field is more reliable than a broad project label.
- Source-record reference
- Physical reel match
- Exposed-end condition
- Known storage-exposure observation
Use local project context without converting it to inventory evidence
The Port says Sweetwater Park opened April 2, 2025 with 39 acres of new public recreational space. That public project reference may help a seller state local context, but it does not show that any public-work material is available, owned by the seller, or connected to this buyer.
For the seller record, identify the actual storage site, release authority, access limitations, and available loading-resource information. Those operational facts belong to the listed reel, not to a city project name.
- Storage site
- Release authority
- Access or escort limitation
- Available loading-resource information