Use a marked product record for metal identity
Record aluminum from the reel tag, jacket legend or a manufacturer document that matches the offered item. Do not infer metal from surface color, outside diameter or a generic feeder description. If the product record names mixed conductors or does not settle the metal identity, write that uncertainty into the line rather than assigning a uniform material description.
The City describes capital projects that include street, sidewalk and alley rehabilitation, traffic-signal upgrades, water, recycled-water, sewer and stormwater improvements, public lighting and park work. This is local project context only; it does not establish aluminum inventory, cable specifications or a transaction. A seller can retain a stated project reference while relying on the reel’s own markings for identification.
- Manufacturer designation copied from tag or jacket
- Conductor-metal evidence source
- Part number or matching document reference
- Unconfirmed or mixed construction called out
Preserve the full feeder assembly
An aluminum line item needs more than a primary conductor size. Record the documented AWG or kcmil size, conductor count, neutral arrangement, shield or support member and marked voltage. Keep each detail in its own field. A neutral or support feature should not be assumed to be aluminum merely because the main conductors are described that way.
Separate reels where any of those assembly facts differs. This avoids the common mistake of using one exterior description for several feeder variants. When a document belongs to only one reel, attach it to that reel reference and do not use it to complete another line.
- AWG or kcmil and conductor count
- Neutral, shield or support description exactly as documented
- Marked voltage recorded from the product
- Reel-specific document and photo reference
Report current lengths and physical condition
An original reel tag may give the shipped quantity, not the material that remains. List current continuous footage per reel and state whether it is measured, documented or estimated. Note exposed ends, flange condition, packaging and storage exposure as observations. These facts help describe the offered inventory without representing an electrical condition assessment.
Keep unused, partial, previously used and unidentified lines separate. Add the storage location, available loading information and the person who can authorize release. That information describes seller-side logistics and ownership control; it does not establish a transport method or acceptance outcome.
- Reel ID and current continuous footage
- Measured, documented or estimated quantity basis
- Visible end, reel and storage observations
- Location, loading facts and release authority
Illustrative aluminum feeder record
Illustrative inventory example—not a purchased lot: AL-DWY-04 lists an aluminum feeder designation copied from a reel tag, 4/0 AWG, 275 feet estimated, partial reel condition, exposed end noted, and neutral or support detail unknown. The fictional example preserves the unknown rather than deciding that every component shares the same material.
A seller can provide the tag image, jacket image and any matching record with the line-item list at saleselectricalbuyers@gmail.com. State what is documented and what remains unknown; a clear incomplete record is more useful than a visually inferred specification.
