Build a line that another reviewer can follow
Create one row for each reel, continuous piece, or genuinely identical group. Record its reference, manufacturer or part number, product designation, conductor metal, size or rating, reel count, and footage per reel. A lot total may be useful as a summary, but it cannot replace the individual information needed to understand different cable specifications.
State whether the footage is measured, documented, or estimated. If jacket printing or a tag cannot be read, keep the line in the list with that limitation visible. Unknown lines do not become a common specification merely because they are stored beside known reels.
- Stable line or reel reference.
- Product designation, metal, size, and rating.
- Count and length per reel.
- Measured, documented, or estimated quantity basis.
Make photos and records point to the same reference
Use the line reference in each photo filename and document label. For a distinct specification, include a tag view, jacket-print view, reel overview, and a condition image when relevant. Attach an existing document only when it identifies the same reel or matching product group.
The mistake is using one attractive reel photograph to represent a mixed lot. The correction is a matched evidence set: every photo and record should lead back to one line, while meaningful differences in condition or construction remain attached to their own references.
- Tag photo.
- Jacket-print photo.
- Reel overview and condition photo.
- Matching document or an explicit no-document note.
Partition the lot by physical site
Separate cable stored at different warehouses, yards, or project locations into site groups. Put the material address or site area, access restrictions, loading equipment, and site contact beside every group. Then state whether groups are being described together or as separate possible offerings.
This site grouping is the central bulk-lot task. It prevents a single footage total from hiding that one reel is indoors at Site A while another is outdoors at Site B with a different release contact and different loading facts.
- Storage address or site group.
- Access restrictions.
- Known loading equipment.
- Site contact and release authority.
Keep release and handling fields specific
For each group, identify who can authorize release, whether the quantity is documented or estimated, and whether the material is offered only as a defined group or individually. Add reel dimensions and weight basis when already recorded, while keeping gross and net concepts distinct.
Where a release contact, handling fact, or quantity is unresolved, mark it pending rather than applying a more complete site’s information to all reels. This makes the inventory usable for review without suggesting that trucking, collection, or purchase terms have been arranged.
- Release authority.
- Offering structure.
- Reel dimensions and weight basis.
- Pending fields separated by site.
Illustrative multi-site record and city context
Illustrative only—not a purchased lot: BL-SL-01 is one documented 500 ft reel at Site A with loading equipment unknown. BL-SL-02 is a separate 90 ft estimated reel at Site B with a release contact pending. The two lines remain separate because their quantity basis, site facts, and release record differ.
San Leandro’s CIP examples include street improvements, sewer replacements, municipal building enhancements, and marina-area and park improvements; the City maintains a 10-year plan of funded and unfunded projects. That public-plan context does not prove that any cable came from a City project or that a project gives a seller authority to release material. It is only a reason to keep actual site and authorization evidence with every inventory group.
- One reference per reel or matching group.
- No shared site facts unless the group actually shares them.
- Do not use one photo or total to represent distinct sites.
