Start with a construction record for each reel
Give every reel or continuous piece a stable reference before making a combined list. Transcribe the manufacturer, part number, complete jacket legend, conductor count and size, marked voltage, and any stated shield or armor detail. A photo filename should repeat the same reference, so the record can be checked without guessing which image belongs to which cable.
Do not use a motor name, shelf location, or former equipment connection as the specification. If a mark is illegible or a data sheet cannot be matched to that reel, leave that field as unknown. This preserves a reviewable line without turning a facility label into a technical claim.
- One reference per reel or continuous run
- Jacket legend and part number copied exactly
- Conductor, voltage, shield, and armor fields marked unknown when unsupported
Separate stock condition before combining inventory
Keep uninstalled maintenance stock, project-held material, and previously removed runs in separate condition groups. For each group, note visible jacket damage, fitted ends, known storage exposure, and service or removal history. Similar-looking cable can have a different record simply because one reel stayed in a storeroom and another came from a field run.
Boulder’s Comprehensive Plan says industrial areas support manufacturing, processing, services, warehousing and distribution, and facilities areas include utility operations and research campuses. That local context is useful only for choosing a sensible facility or storage grouping; it does not establish what cable is available or what will be purchased.
Match quantity evidence to photographs and documents
Record current continuous length for each reel and label the basis as measured, documented, or estimated. When an existing data sheet, inventory entry, or manufacturer record is available, identify the reel reference it actually matches. A report for a nearby reel should remain a separate record rather than fill an identification gap.
Photograph readable printing, the reel label, a whole-reel view, accessible ends, and visible condition differences. If a length or shield detail is not known, the most useful correction is a clear unknown note, not a reconstructed specification. This page concerns inventory description, not electrical testing or installation advice.
Confirm the release path and correct the common mistake
State the storage location, release authority or pending approval, access restrictions, loading resources, and requested timetable for the offered lines. These are site facts for a lot-specific discussion; they do not book transport or establish an offer. They keep a technically identified reel from being listed before its ownership or access is clear.
The common mistake is presenting one plant aisle as if it were one cable specification and one condition. Correct it by splitting the list by reel, condition group, and supported construction. Illustrative inventory example—not a purchased lot: IC-BD-11, manufacturer part number recorded, 380 ft documented on an uninstalled reel, shield status unknown, facility release approval pending.
- Keep release approval separate from cable identification
- List access limits and on-site loading resources as known facts
- Leave a pending authority or unknown length visible in the record
