Start with construction, not the project name
Industrial cable records often inherit a plant, pump-station or project label. That label may explain where material was stored, but it does not establish conductor count, voltage, shield or jacket construction. Build the inquiry around the actual product record and treat the site label as context only.
Castle Rock’s development process covers new roads, water lines, subdivisions and commercial areas; engineered construction drawings typically include roads, water and sewer lines, stormwater, lighting and landscaping. That local context may explain a project record, but it does not identify the cable on a reel.
- Keep one inventory line per distinct construction and continuous reel/piece reference.
- Preserve photographic references to the reel ID or piece marking used in your records.
Step 1 — Assign each product line
Create one line per matching specification and preserve the reel or piece reference used in photos. Do not substitute a project or facility name for the cable specification. For each line, supply the evidence fields: inventory reference, manufacturer, complete part number and cable designation.
If you cannot read a full part number from the jacket, record the exact visible legend and flag the part number as unknown. Do not infer a complete part number from nearby tags, purchase orders or equipment labels.
- Evidence required: inventory reference; manufacturer; complete part number; cable designation.
- When a jacket legend is partial, attach clear photos of the legend and the reel/piece reference.
Step 2 — Capture construction
Transcribe jacket printing and attach the matching data sheet instead of naming the cable from the adjacent equipment or project. Record conductor count/size, conductor metal, marked voltage, shield or armor and jacket designation exactly as printed or as shown in a manufacturer data sheet.
If the jacket shows conflicting markings, record both strings and indicate which string is legible and used to assign the designation. If a construction element (for example shield type) cannot be verified visually or from documentation, mark it unknown rather than guessing.
- Evidence required: conductor count/size; conductor metal; marked voltage; shield/armor; jacket designation.
- Attach photos of cross-section, jacket legend, and any data-sheet excerpts that match the printed legend.
Step 3 — Separate condition histories
Keep maintenance stock, uninstalled project material and removed runs on separate lines. For each line, disclose unused or removed status, service/storage history, fitted ends and visible jacket damage. Distinguish fitted ends (factory-terminated or field-fitted) from intact, uncut reels.
If a reel shows evidence of field use (scratches, cut ends or splice marks) classify it as removed and record the visible damage and any attached service tags. For material with unknown history, mark the service/storage history as unknown and include photos that demonstrate condition.
- Evidence required: unused or removed status; service/storage history; fitted ends; jacket damage.
- Keep separate lines for similar constructions that differ only by history (for example identical cable from same project but with one reel unused and one reel removed).
Step 4 — Reconcile quantity
Record every continuous length and state whether footage is measured, documented or estimated. Replace original order quantities with reel-level current footage and its evidence basis. Provide the continuous length, quantity basis, reel count and current balance per inventory line.
If footage is unknown, note whether the balance is estimated from reel diameter, tag notes or an original purchase order. Be explicit: do not present an original order quantity as today's balance without evidence tied to the physical reel or a recent measurement.
- Evidence required: continuous length; quantity basis; reel count; current balance.
- When footage is documented (for example a measured reel ticket), include an image or PDF of the measurement record.
What to do with unknown or incomplete inventory
If jacket legends are worn or missing, do not substitute a facility name or rely solely on an original purchase order. Leave unsupported construction fields unknown and attach the best available evidence: close-up photos of jacket remnants, reel tags, nearby cable markings, or a partial data-sheet snippet.
Where continuous length is unmeasured, clearly state the basis for any estimate (reel measurement, tag note, documented run length) and mark its confidence level. If you cannot provide the required evidence for a line, present it as an unknown-designation lot and indicate which requiredEvidence items are missing so the buyer can request inspection or testing.
- If key evidence is missing, mark construction or quantity 'unknown' and attach photographic proof of the gap.
- List missing requiredEvidence items on the line so reviewers know exactly what remains unconfirmed.
Illustrative record (worked example)
Illustrative record only — not a purchased lot. This fictional worked example shows how to present one line when part of the required information is unknown: reference IC-CR-01 uses a manufacturer part number transcribed from the jacket as the designation, records construction as '4 conductors, 6 AWG; shield unknown', shows quantity as '420 ft documented; uninstalled maintenance stock' and clearly states the history as a fictional worked example.
Use this format for every line: a short inventory reference, a transcribed designation (or the visible legend if complete part number cannot be proven), construction with any unknowns flagged, quantity with its evidence basis, and a history summary.
- Example fields: reference IC-CR-01; designation manufacturer part number transcribed from jacket; construction 4 conductors, 6 AWG; shield unknown; quantity 420 ft documented; uninstalled maintenance stock; history fictional worked example; no purchase implied.
- Do not treat the illustrative record as an offered lot. It is a template for documenting real items.