Separate project labels from reel construction
An underground-project description can conceal different assemblies. Build one line for each reel or truly matching group, then transcribe the manufacturer designation, conductor metal and size, marked voltage, and every neutral, shield, or configuration detail that is actually printed or documented. A drawing may be useful background, but it does not replace the offered reel’s tag or jacket legend.
GRU's business-electric page reports approximately 99,700 customers, a 124-square-mile service area, 1,417 total electric distribution circuit miles and 60% underground distribution lines. That local context explains why a seller’s files may use underground or distribution language; it does not identify the construction of a particular reel or show that GRU is connected to the offered material.
- Assign one reel reference before copying any designation.
- Keep conductor, voltage, neutral, and shield fields separate.
- Mark a missing configuration field as unknown rather than borrowing it from another reel.
Reconcile what remains on each reel
The footage on a project schedule or original reel label may not be the footage still present. Record continuous length for each reel, the count of matching reels, and whether the figure is measured, documented by a current record, or estimated. A grand total is not a substitute for per-reel lengths because separate lengths may not be interchangeable for a purchasing review.
If an estimate is unavoidable, identify the basis, such as a current warehouse ticket or an explained reel-dimension estimate. Keep dimensions and weight in their own fields, and say whether a weight is gross, net cable, or unknown. Do not present a loaded-reel weight as conductor weight.
- Continuous footage per reel and reel count.
- Measured, documented, or estimated quantity basis.
- Reel dimensions and gross or net weight basis.
Keep condition histories distinct
Separate uninstalled reels, removed cable, and unidentified recovery material before submitting the list. For each record, describe known storage setting, visible jacket or flange damage, accessible-end protection, and any known moisture exposure. These notes document the lot without claiming electrical fitness or deciding its eventual disposition.
A common error is to call every reel “underground project cable” and reuse original project footage as today’s quantity. Correct it by splitting mismatched constructions, preserving each current footage basis, and leaving a voltage or neutral configuration unknown where the evidence does not settle it.
- Condition category and storage history.
- End protection and visible damage notes.
- Separate lines for uninstalled and removed material.
Prepare a release and access handoff
For every reel, identify the storage location in practical terms, the role that can authorize release, and access limits such as gates, dock constraints, or site scheduling. Also note available loading resources without assuming a transport method or date. A release contact who can only view a reel is not necessarily the person able to approve its transfer.
If the authorization, access, or loading information is not known, state that plainly and say which internal record or contact could resolve it. Keeping that uncertainty on the inventory line is more useful than postponing it until the rest of the cable record has been reviewed.
- Release-authority role and any approval condition.
- Storage location and access restrictions.
- Available loading resources and an explicitly unknown timetable when needed.
Use a reel record that exposes unknowns
Illustrative inventory example—not a purchased lot: UD-GV-01; distribution designation copied from tag; conductor size recorded; neutral configuration unknown; 580 ft documented on one warehouse reel; uninstalled; gross weight includes packaging; release authority unknown. This is a format example, not evidence about an actual Gainesville lot.
Attach photos using the same UD-GV-01 reference: tag or jacket legend, reel overview, accessible ends, and any visible condition issue. If several reels share a project label but not the same construction, assign a new reference to each construction instead of treating the label as proof that they match.
- Reference carried through inventory, photos, and records.
- Exact construction fields plus current quantity basis.
- Unknown release or configuration recorded visibly.