Reconcile the purchase record with current reels
Use the purchase order or inventory export as a reference, then walk the storage area and assign a line or reel ID to each item that is still present. Copy the manufacturer, part number, current reel count, exact storage area, and any readable tag information beside that ID. A past order establishes what was ordered; it does not establish the footage or availability that remains today.
For each reel, record its remaining continuous length and label that figure measured, documented, or estimated. Keep full reels, partial reels, boxes, and cut lengths on different lines. This is the practical decision on this page: reconcile the physical balance before representing project-overrun cable as stock available for sale.
- Give every reel an inventory ID that also appears in photo filenames.
- State the current reel count and the basis for every length.
- Keep a separate line for unopened boxes and for cut lengths.
Separate availability from surplus status
Explain why each line is being released: project overrun, warehouse excess, discontinued material, or maintenance stock. Then mark whether it is cleared, reserved, pending return, or awaiting approval. A reel can be correctly identified and still be unavailable, so the availability field should never be inferred from its presence on an old invoice.
The South Fulton Development Authority launched an economic-development platform for site selectors, developers and business leaders, with available sites, workforce and demographic data and initiatives. That is local business context, not evidence that a particular reel is for sale; the actual storage location, current count, and release status must come from the seller's own record.
- Use one stated surplus reason per line.
- Mark reserved and pending-return material separately.
- Do not convert an invoice total into a current available balance.
Make release authority visible
List the owner or selling organization, the role that can approve release, and the current approval status for each group. The person taking photographs may not have authority to release the cable. If the role is unknown, leave the field unknown and identify who is expected to confirm it rather than calling the reel available.
When stock sits in more than one area, map the inventory IDs to the relevant room, aisle, yard, or warehouse reference. Include access constraints and available loading information as facts about the site, not as an assumed collection arrangement. Those details help scope the later discussion without promising transport.
- Owner or seller identity.
- Release approver role or organization.
- Approval status: cleared, pending, reserved, or unknown.
- Actual storage reference and access limitations.
Worked record and incomplete balances
Illustrative example—not a purchased lot: OV-SF-01 is a project-overrun feeder cable with its part number copied from the tag. The record shows two reels: 300 ft documented and 180 ft estimated; it is uninstalled, but release is pending. The example makes the estimate and the approval gap visible instead of treating both reels as a single confirmed balance.
If a reel cannot be accessed, list the item as access unverified and retain the last known record, the date of any photo, and the missing step. Do not invent a confidence percentage or fill a gap with a similar reel. A concise unknown field is more useful than an unsupported present-stock claim.
- Example fields: reel ID, marked product, per-reel length, quantity basis, condition, release status.
- Record what is missing and the person or record needed to resolve it.
