Keep the planning reference separate from the reel identity
Start a record with a reel ID, then attach its tag, jacket-printing photos, product document, and any project or packing reference that actually matches that reel. A planning citation may explain why someone is searching for records, but it is not a cable specification and should not be copied into the product fields.
If a record appears related but the match is incomplete, state the basis for the tentative connection and leave unmatched fields unknown. This prevents one regional description from being used to label several reels with potentially different voltage, conductor, or neutral construction.
- Unique reel ID and matching photo filenames
- Actual designation and manufacturer record where available
- Project or packing reference connected only when traceable
- Tentative link clearly labeled with its basis and limits
Transcribe the marked distribution construction
For each reel, record conductor material and size, marked voltage, neutral or shield configuration, insulation or other construction wording, and the complete designation. Keep field names separate so a documented 15 kV mark, for example, is not confused with conductor size or with a broad description such as underground cable.
Do not assume that all distribution cable on one project has the same construction. If a tag omits neutral or shield information, say that it is not documented. A matching product record may fill a gap only when its part number or other identifier connects to that exact reel.
- Designation plus conductor material and size
- Marked voltage copied exactly
- Neutral, shield, and configuration information retained
- Product record match stated or left unknown
Preserve per-reel quantity and condition facts
List the length per reel, the quantity basis, dimensions, weight basis, visible end condition, and known storage history. Keep gross, net, and estimated weight labels distinct. A large reel’s handling information can be useful to a later discussion, but it should not be presented as a transport commitment.
Where a length is estimated, state the evidence for the estimate and keep it separate from measured or documented footage. Do not turn several separate reels into one continuous run. Their end condition, storage notes, and marked configuration may differ even where the product family is similar.
- Length per reel and measured, documented, estimated, or unknown basis
- Dimensions with gross, net, or estimated weight basis
- End and storage condition observed without testing claim
- Uninstalled or previously in-service history stated separately
Resolve release and access before calling the handoff complete
Add the owner, release-authority role, storage location, access limitations, and available loading resources to the reel record. These are release facts, not technical cable characteristics, so keep them visible without assuming a schedule or method of transport.
The key mistake is treating underground project cable or an Idaho Power planning reference as one uniform product. Resolve it by splitting the inventory by actual marked voltage and construction, matching each document to its reel, and leaving missing neutral, shield, length, or authority data explicit.
- Owner and release authority recorded separately
- Actual storage location and site access note
- Available loading resources described factually
- Missing release information marked as pending or unknown
Use the Meridian electrical-plan fact only as limited background
Idaho Power’s Eastern Treasure Valley plan identifies preferred substation and transmission concepts near Meridian, including Sub 23 southeast of Carmel Drive and Meridian Road and a 138-kV connection along Fairview Avenue to the Meridian Substation.
This is planning context, not a statement that a seller owns, has, or can release cable from any named concept. A fictional example—not a purchased lot—would be UD-MER-06; distribution designation from tag; neutral configuration pending; 580 ft documented; warehouse reel; gross weight includes packaging; project reference attached.