Treat the reel marking as the product record
“Underground project cable” is not a sufficient description for a buying review. It does not reveal the marked voltage, conductor metal, size, neutral arrangement, shield or actual configuration. Transcribe the reel tag and readable jacket information instead of carrying an assumed specification out of the project file.
For each assembly, preserve the designation, metal and size, marked voltage and neutral or shield configuration as separate fields. A project reference can sit beside those facts, but it should never fill a missing rating or configuration field.
- Manufacturer designation.
- Conductor metal and size.
- Marked voltage.
- Neutral, shield or configuration details, including unknowns.
Build a reel-by-reel handoff list
Give every reel a reference and record its continuous length, dimensions, weight basis and visible end condition. If several reels match, list the count and retain the individual length for each reel. A gross reel weight including packaging must not be relabeled as a cable-only or conductor-weight figure.
The common handoff mistake is turning a project name and a grand total into the entire inventory. Resolve it by linking every quantity to a reel, and by marking length and weight as measured, documented or estimated. The physical reels, not a civil-project label, establish the inventory line.
- Reel ID and continuous length.
- Dimensions and gross, net or estimated weight basis.
- Visible end condition.
- Matching-reel count without erasing individual length.
Keep history and condition in their own fields
Record whether the reel is uninstalled stock, has been removed from service or remains unavailable, together with known storage history, moisture exposure and end protection. These are condition facts, not conclusions about future use. A visible end or storage photo should be tied to the same reel reference.
When a record is incomplete, say which construction or condition field is unknown. Do not use the project’s purpose to infer that the cable has a particular rating or that it is in a particular condition. The purpose of the handoff record is to preserve uncertainty as well as facts.
- In-service, uninstalled, or removed status.
- Storage history and known moisture exposure.
- End protection or lack of it.
- Unknown construction details explicitly stated.
Record authority and access at the handoff point
State who on the seller side can authorize release, where each reel is stored, what loading resources are known and what access limits apply. These details allow a practical lot review without treating a project handoff as a transport commitment.
Lexington Environmental Quality and Public Works manages construction involving roads, sidewalks, bridges, sanitary-sewer trunk lines, pump stations, wastewater improvements, storm sewers, culverts and drainage management. The city’s project list is relevant context for a civil-project inventory scenario only. It does not identify the voltage, configuration, owner or quantity of a seller’s distribution reel.
- Authorized releaser.
- Storage location.
- Known loading resources.
- Access constraints or pending details.
Worked record where configuration is incomplete
An illustrative inventory example—not a purchased lot: UD-LX-01; distribution designation copied from tag; neutral configuration pending; 580 ft documented; warehouse reel; gross weight includes packaging. The example makes the configuration gap visible instead of inserting a neutral type from the project description.
This page is distinct from an aluminum-feeder record: it preserves marked voltage and neutral or shield construction through a civil-project handoff. When the central question is whether an assembly is aluminum rather than its handoff record, use an aluminum-specific reel record instead.
- Reference: UD-LX-01.
- Product: distribution designation from tag; neutral configuration pending.
- Quantity: 580 ft documented; warehouse reel.
- Weight: gross figure includes packaging; illustrative only.