Record the marked aluminum designation
Copy the manufacturer designation, conductor-metal wording, and part number from the tag, jacket, or matching product record. A silvery exposed component is not enough to establish every conductor in an assembly as aluminum. If the designation cannot be read or matched, keep the metal field unknown.
Keep the evidence tied to a reel ID. A product sheet can be helpful only where its part number or record link corresponds to the offered reel. This avoids turning a general feeder description into a claim about the specific inventory being presented.
- Manufacturer designation
- Metal source wording
- Part number
- Reel ID and matching document reference
Preserve the complete feeder assembly
Record AWG or kcmil, conductor count, and any neutral, shield, or support member exactly as documented. Those parts may have different roles or material descriptions. Do not estimate size from outside diameter or turn one confirmed component into a statement about the complete assembly.
Where the record describes mixed components, list them separately. If the neutral or support construction is absent from the available evidence, mark it unknown. This detail makes an inventory line usable without pretending it contains a fully confirmed bill of materials.
- AWG or kcmil
- Conductor count
- Neutral, shield, or support member
- Marked voltage when visible
- Unknown component fields
State length and condition reel by reel
Give each reel a continuous-footage value and say whether it is measured, documented, or estimated. A partial reel should not inherit its original label length without a current basis. Note exposed ends, damaged flanges, removed history, and visible jacket condition in separate fields.
Use the condition field to describe what is observed, not to make a test or suitability claim. If a record is incomplete, retain the unknown alongside the known measurement. A clear partial record is safer and more actionable than an exact-looking number derived from an assumption.
- Continuous footage
- Measured, documented, or estimated basis
- Partial-reel status
- Exposed-end, flange, and visible-condition notes
Add handling context without presuming movement
For each large reel, provide dimensions, a gross, net, or estimated weight basis, storage location, and known loading access. This separates practical handling information from conductor identification. If the weight is an estimate, state the source of the estimate rather than presenting it as scale-confirmed.
Authority to release and site restrictions should be recorded as their own facts. The record can then support a lot-specific discussion without promising a collection method, transport timing, price, or acceptance for the particular feeder cable.
- Dimensions
- Weight and its basis
- Storage location
- Loading access
- Release authority
Use city context only as background for organizing reels
The city says its Regional Infrastructure Department coordinates long-range infrastructure planning for Reno and Northern Nevada to address new growth and replacement of existing infrastructure.
This is limited context for grouping feeder or distribution inventory by an infrastructure-related source. It does not establish a cable type, a seller lot, or a local demand claim. The exact marked construction and reel record control the description of the offered material.
- Project source kept separate from product identity
- Marked assembly controls the inventory line
