Set an offered boundary before totaling footage
Start with the physical inventory, not the warehouse export. Give every reel, box, or continuous length an inventory reference and one status: available, reserved, pending internal release, or excluded. A line that is still allocated to another project belongs outside the offered group even if it appears in the same original order.
Record the actual Yonkers storage location, the project or warehouse source, and the person who can confirm release. If a location or approver is unknown, keep the line in the list but mark that field unknown rather than presenting it as ready for a buying discussion.
- Inventory reference and physical storage location
- Offered status separate from original purchasing status
- Project or warehouse source and release contact
Reconcile the current reel balance
Match each inventory line to the physical reel tag. Copy the manufacturer, part number, reel ID, original footage, and current footage into the same row. Original footage remains useful history, but it is not a current quantity after a reel has been used or split.
Label the basis for current footage as measured, documented, or estimated. For an estimate, state the method and preserve the tag and photographs that identify the reel. Do not substitute a project total for reel-level quantities; a total can conceal several short pieces or an unverified balance.
- Manufacturer, part number, and reel ID
- Original footage beside current footage
- Measured, documented, or estimated quantity basis
Keep different quantity forms on different lines
Full reels, partial reels, unopened packages, and cut lengths should not share one quantity field. List the continuous length for each reel or matching group, the reel count, any cutoff count, visible condition, and a photo filename that matches the inventory reference.
Group material only when the product markings and condition actually match. A partial reel with a pending release and a full reel available for sale are not one interchangeable line simply because their original purchase records match.
- Continuous length per reel rather than only aggregate footage
- Separate full reels, partial reels, boxes, and cut lengths
- Photo reference and visible condition for each line
Use local context as context, not inventory evidence
The DRI program description says the city is in a community-led planning and project-identification process, and proposed projects in the 2025 application are proposals rather than approved implementations.
That planning context can explain why a seller keeps a careful project record, but it does not identify cable, establish demand, or show that any material is available. The useful submission still rests on the physical reel, its current balance, and the seller's actual release authority.
- Keep local project background separate from product identification
- Do not treat a proposal or project name as proof of available cable
Work a concise reconciliation record
Illustrative inventory example—not a purchased lot: OV-YK-01; product: part number copied from reel tag, full designation pending; quantity: two partial reels, 300 ft documented and 180 ft estimated; condition: uninstalled; photo match: OV-YK-01-tag.jpg and OV-YK-01-reel.jpg; release: one line pending internal approval.
The common error is reporting original purchase footage as current availability and combining reserved reels with the offered balance. Correct it by keeping one current-balance line per reel or genuine match, naming the evidence basis, and excluding unapproved material until the seller can document its status.
- Example values are fictional and show uncertainty openly
- Move reserved or unapproved lines out of the offered group
- Send the inventory through the page form or to saleselectricalbuyers@gmail.com
