Start with the complete feeder assembly
Record the manufacturer designation and complete part number from the reel tag, jacket legend, packing list or a matching data sheet. Capture conductor size, conductor count and marked voltage as separate fields. A silvery surface is not a reliable substitute for the product record, especially when the assembly can include more than one metal.
Keep the main conductor, neutral, shield and support-member descriptions separate. If the tag does not identify one of those elements, enter “unknown” and retain a photo reference rather than filling the gap from appearance. That distinction is useful when several feeder reels share an outside diameter but have different documented construction.
- Manufacturer designation and complete part number
- Conductor size, count and marked voltage
- Documented neutral, shield and support-member wording
- Photo reference and an explicit unknown field where needed
Make reel quantity and condition traceable
Use one line for each continuous feeder length. Record the reel ID, remaining footage and its basis: measured, documented or estimated. Note exposed ends, visible jacket wear and damaged flanges as observed conditions; keep those notes separate from the cable’s product identification.
For a large reel, list diameter, width, hub opening and the basis for any weight figure. Gross loaded-reel weight, cable-only weight and an estimate are different entries. This prevents a handling note from being mistaken for a claim about conductor content.
- Reel ID and continuous footage with basis
- Full, partial or unknown quantity status
- End condition and reel condition
- Dimensions plus gross, cable-only or estimated weight basis
Keep storage and release facts with the line item
Identify the actual storage area, access limits, available loading resources and the person or role that can authorize release. If authority is pending, say so. These are lot facts, not a promise that the material will be moved or accepted.
The Port page says facilities serve container, bulk, breakbulk and roll-on/roll-off operations and have direct interstate access to I-95 and I-40 plus daily CSX service. That Wilmington logistics context can help a seller describe access, but it does not identify the feeder, prove its origin or settle handling terms.
- Storage location or private location reference
- Access restrictions and available loading resources
- Release authority or pending authority
- Photo and record filenames matched to the reel ID
Resolve incomplete records without guessing
When a data sheet is missing, retain the exact readable tag text, part number and reel ID. Mark the construction detail that depends on the absent record as unknown or pending. Do not combine a documented reel with a similar-looking reel merely to complete a line.
A workable fictional record might read: “AL-WI-01; feeder designation transcribed from tag; 4/0 AWG documented; 275 ft continuous, estimated; neutral/support description pending matching data sheet.” It is an illustrative record, not a described seller lot, and it shows how an unresolved field remains visible.
- Exact readable tag text
- Missing-document note
- Reason a value is estimated or unknown
- Record-to-reel match check
