Capture the jacket designation first
Record the complete readable marking, whether it includes Type TC, TC-ER, PLTC, or another designation, together with manufacturer and part number. A cable’s former tray location is useful background but does not establish the product type. Photograph the text and assign it to a reel reference.
If the marking is worn or absent, state designation unknown. Do not turn a cable’s color, route, or nearby label into a substitute identification. This preserves an honest line that can later be matched to a proper product record.
Split reels by real construction differences
Keep separate lines for differences in conductor count, pair count, gauge, shielding, jacket details, or other recorded construction. Similar outer jackets often conceal a meaningful distinction, particularly where several multi-conductor products were stored together.
A product group can organize matching lines, but an unknown shield or pair count should not be merged with a confirmed construction. Preserve the difference even if the footage, color, and project source are the same.
- Exact jacket designation
- Conductor count and pair count
- Gauge and shielding status
- Manufacturer and part number
Record partial reels without creating a false match
For each reel or cut piece, state the continuous length and whether it is measured, documented, or estimated. Note fitted ends, visible condition, and known service history. The quantity record should remain with the construction line so a 240-foot partial reel is not treated as interchangeable with a full matching reel.
Use photo filenames and document names that include the same inventory reference. This allows a product sheet or closeout note to be checked against the right cable without using it as proof for another reel.
Keep closeout context in its own field
The City of Columbia planning page has a dedicated Commercial Development section covering commercial and multifamily zoning, permits, inspections, water-meter and sewer-tap sales, and utility information. A Columbia commercial-development reference may explain a closeout record, but it cannot substitute for the printed designation or a stated footage basis on control or tray cable.
If project paperwork is available, note the project reference and the matching line ID separately from product identity. This retains useful provenance while keeping the decision focused on the cable’s own construction.
Fix the tray-location assumption
The common error is labeling everything found in a tray as Type TC and combining similar-looking reels. Correct the list by transcribing actual markings, separating every construction difference, and leaving unsupported fields unknown.
A fictional line could read CT-COL-03; TC-ER marking photographed; 12 conductors, 16 AWG; shielding unknown; 240 feet measured; fitted ends present. It is not an actual lot. It demonstrates that a precise record can state both what is known and what remains unresolved.
