Define what is actually being offered
Begin with a project, warehouse, or closeout export, but create a separate offered-status field for every line. Mark material offered, retained, reserved, pending return, missing, or not yet released. The offered subtotal should include only the lines the seller can identify as physically present and available for a further purchasing discussion.
A project name is useful background, not a cable specification. Keep the project or job reference beside the reel reference, part number, and actual storage location. That separation prevents an administrative record from becoming an unsupported claim about the physical lot.
- Project or job reference
- Offered, reserved, pending-return, or unavailable status
- Reason a line is excluded from the offered subtotal
Reconcile records to the reels in storage
Match each inventory line to a reel ID, readable tag or jacket marking, and storage location. Note the physical-match result: matched, not located, tag unreadable, or quantity unconfirmed. If the system says three reels but only two are located, preserve the discrepancy rather than adjusting the count to fit the export.
Photographs should be named to the reel reference and show the tag, visible cable, and condition. The goal is not a polished report; it is a traceable answer to which recorded line corresponds to which physical item.
- Inventory-line reference and reel ID
- Part number or printed designation when readable
- Storage location and physical-match result
Keep reel quantities and conditions separate
List full reels, partial reels, and cut lengths separately. For each offered line, state continuous footage and whether it is measured, documented, estimated, or unknown. A total from the original purchase order can remain in the file as history, but it should not replace current reel-level amounts.
Document visible condition, packaging condition, and any known storage limitation in a separate note. Gross reel weight, cable weight, and conductor weight are different measures; report the basis available and do not convert one into another without support.
- Length per reel rather than an aggregate project total
- Quantity basis for every value
- Condition and storage notes kept apart from release status
Treat Franklin growth information as context, not inventory proof
Franklin's growth page says the city uses four main impact fees—roads, water, sewer and parks—and that new development contributed roughly $170 million in impact fees over the last decade.
That local statement may explain why project-related records exist, but it does not establish that a named project produced excess cable or that any specific reel is for sale. The practical work remains a reel-by-reel physical and release reconciliation.
- Use city context only as background
- Do not infer material availability from development
- Let physical reel evidence control the offered list
Record release authority before the handoff
For each offered group, provide the authorized seller contact, approval status, storage ZIP, access limits, available loading information, and seller timetable. If an internal signoff is pending, show it as pending and exclude the item from the releasable subtotal until the seller can document otherwise.
Send the inventory and photos to saleselectricalbuyers@gmail.com. For a complex project-overrun file, call +1 (614) 715-3047 with the record structure in hand. An inquiry begins a lot-specific review; it does not settle an offer, transport arrangement, or release terms.
- Authorized seller and approval status
- Access and loading facts supplied by the seller
- Pending items remain visibly pending