Step 1 — One line per identified reel
Create a separate record for every reel or coil you plan to offer. For each line, transcribe the full jacket printing and any reel tag data exactly as shown. Include the manufacturer name and complete part number when present; record conductor count, conductor size and metal if marked; capture the marked voltage, and note any shield, armor or jacket designation. Assign a stable internal reel reference (for example IC-A01) and keep that reference on all photos and documents.
If the jacket printing is partially missing, photograph the printing areas and the reel tag, and mark the missing fields as unknown rather than substituting neighboring reel information. The brief’s guidance is to use the actual jacket printing, reel tag or traceable matching product sheet for each reel; unsupported construction details should be left unknown.
- Required evidence fields: reel reference; manufacturer and part number; conductor count/size/metal; marked voltage; shield/jacket designation
- Attach clear photos of jacket printing, reel tags, and any accessible product sheets
Step 2 — Separate stock from removed cable
Categorize each reel as uninstalled maintenance stock, project-change stock, or removed material. Record any fitted ends (lugs, terminations or cuts) and a concise separate service history note when available (for example: removed from Motor A, run hours unknown). Do not infer suitability or remaining lifespan; keep service history as an independent field.
When a plant equipment name appears as the cable specification, do not copy that label into the construction fields. The common mistake in plant closeouts is to apply an equipment or department name as the cable spec or to copy a neighboring reel’s data sheet onto multiple reels. Avoid that by verifying each reel’s own markings.
- Required evidence fields: condition category; service history; fitted ends; visible damage; matching records
- Retain removed-service history separately from construction details
Step 3 — Reconcile current balance per reel
Physically measure or document the continuous remaining footage for each reel and state the quantity basis (measured, documented, or estimated). Specify whether the reel is full or partial and include the inventory record reference or export line that matches your reel reference.
Do not merge multiple reels under a single unspecified inventory line. If your inventory export groups all department cable under one entry, reconcile that export to your per-reel list and retain the export reference so reviewers can trace totals back to your accounting or stock system.
- Required evidence fields: current footage per reel; quantity basis; full/partial status; inventory record reference
- If footage is estimated, explain the method used and attach photos showing remaining layers on the reel where possible
Step 4 — Document release authority and access
Identify the property owner or authorized releaser for each reel and state any known storage location and access limits. Note whether specific loading resources are required or available (crane, forklift, dock) without implying transport has been arranged. Record who must sign a release and where the reels are physically located.
If authorization is pending, mark the release field as pending and keep the owner/release name in your record. Do not assert that items are cleared for pickup unless you can document the party who grants release in writing and include that reference.
- Required evidence fields: owner/release authority; storage location; access limits; loading resources
- Photograph site access points and any storage area signage to clarify physical constraints
Use local context without inventing inventory
The Development Corporation of Abilene lists manufacturing, defense, healthcare, education and financial services among the city's major-employer sectors and names employers including Bridgestone Bandag, AbiMar Foods, Petrosmith and Rentech Boiler Makers. This is city context for a plant or maintenance inquiry only; it does not say that any named organization has cable available or a relationship with Industrial Wire Buyer.
If construction details are missing, record the field as unknown and attach supporting photos and the reel reference. Leave unsupported fields blank rather than applying a neighboring reel’s specification. For any unknowns, describe what additional documentation would resolve the gap (example: a readable reel tag, a matching product sheet, or a manufacturer packing list).
When footage or condition is estimated, explain the estimation method and retain that estimate as the quantity basis. Provide a clear route for follow-up: who can provide measured footage, who can authorize access for inspection, and which documents can be obtained to support product identification.
- If uncertain: mark fields unknown, document why, and list the specific evidence needed to verify
- Keep removed-service history distinct from construction and avoid combining them into a single description
Illustrative record example
Illustrative only — not a purchased lot: show how to present a single reel line. Example fields: reel IC-A01; product: manufacturer part number recorded; 4 conductors, 6 AWG; shield status unknown; quantity: 420 ft documented; condition: uninstalled maintenance stock; release: authorization pending. Use photos of the printed jacket, the reel tag, and a shot of the reel with a ruler or reference to support footage claims.
This example follows the brief’s resolution: rely on actual jacket printing, reel tags or traceable product sheets for each reel and keep removed-service history as a separate field.
- Label all photos with the reel reference so they remain traceable to the one-line record
- Do not substitute an equipment name for the manufacturer part number
