What we ask for first
Start by capturing every readable printed designation on the jacket: TC, TC-ER, PLTC, manufacturer part number, marked voltage, and any other legend. Transcribe the exact characters; a single reel may show multiple markings and those differences matter.
Attach a photo reference showing the jacket legend and any spool tags next to a readable reel ID. If a marking is unreadable, mark that field unknown rather than assuming a type based on storage or nearby reels.
Evidence fields to include with every reel: reel ID, designation, part number, marked voltage, and photo reference. These let us match documents or confirm that no additional data is available.
The City of Allen land-development team oversees design and construction of land development, with construction inspectors working continuously with project contractors on infrastructure development. That limited local context supports keeping contractor-related cable records tied to the correct reel; it does not identify a particular control or tray cable lot or imply buyer interest.
Separate construction variants even when reels look alike
Do not group multiple reels into one line item when conductor count, shielding, gauge, or jacket construction differs. Use separate lines for each construction variant (conductor/pair count, gauge, shielding, jacket type, and fitted-end differences).
List shielding explicitly (unshielded, foil, braid, combination) or record shielding as unknown where it cannot be determined without damaging the jacket. Note fitted ends or terminations on the reel: presence of lugs, connectors, or factory seals are important for downstream use and valuation.
- Evidence fields: conductor/pair count, gauge, shielding, jacket, fitted ends.
Length, quantity basis, and history
Record continuous length per reel or per cut and state whether the length was measured, documented, or estimated. Distinguish between uninstalled project stock, maintenance stock, or removed material.
Describe visible condition and any damage: abrasion, moisture exposure, crushed reels, or welded-on hardware. If the reel is a partial and was cut from a larger spool, note measured continuous length and whether the remaining spool is present.
Evidence fields: continuous length, measured/documented/estimated, condition/history, visible damage.
Attach matching records and be honest about unknowns
Link data sheets, packing lists, vendor tags, or inspection records to the exact reel ID. Record the document reference and whether the document clearly matches the reel or only appears to match a batch. If a data sheet cannot be matched to that specific reel, mark the reel's fields that depend on it as unknown.
When a neighboring reel's tag appears to be the only matching document, do not transfer that tag's designation automatically; instead list the document under document reference and mark 'reel/batch match' status explicitly.
Evidence fields: document reference, reel/batch match, unknown fields, storage exposure.
How we handle incomplete inventory
If jacket legend is missing or illegible, record the reel ID and photo reference and mark designation/shielding/gauge as unknown. Provide any circumstantial notes (same contractor area, same color jacket) but keep them separate from verified fields.
You can submit records with unknown fields when those gaps are stated plainly: unknowns remain in the lot description while the available identification, quantity, condition, and photo fields stay visible.
Illustrative record — how to format your submission
Use a single-line reel reference with the required evidence fields populated. Example (illustrative only): reel ID CT-Allen-03, designation 'TC-ER marking; 12 conductors, 16 AWG; shielding unknown', quantity 240 ft measured continuous, condition 'Removed cable with fitted ends present', and documents 'Data sheet not matched; designation uncertainty disclosed'.
Providing records in this precise, reel‑level format speeds review and avoids the common mistake of merging multiple reels into a single assumed Type TC line item.
