Carry the physical designation through the project handoff
Begin with the offered reel, not the project description. Copy the manufacturer designation, conductor material and size, marked voltage and any neutral, shield or configuration detail from the tag, jacket or matching product document. Photograph the wording and give the reel a stable ID. If project paperwork uses a broader label, retain that paperwork as background rather than allowing it to replace the physical reel record.
Where the reel tag and project document conflict, put both references in the inventory and identify which one is physically marked on the reel. The seller decision is whether the actual construction survived the handoff from project file to current stock. A configuration that cannot be supported should be marked unknown, not inferred from intended underground use.
- Record reel ID, manufacturer designation, conductor material and size.
- Transcribe the marked voltage and neutral, shield or configuration field.
- Flag a conflict between project paperwork and reel marking rather than resolving it by assumption.
Separate current reel quantity from project quantity
For every reel, list continuous footage, reel dimensions and the basis of any weight: gross, net, estimated or unknown. Mark footage as measured, documented or estimated. Several reels should remain separate even if their project paperwork describes one material line, because current balance and end condition may differ from reel to reel.
An original project quantity is a historical reference, not proof of what remains. The specific mistake to avoid is presenting planned footage as current inventory. A workable record retains the project reference in one field and the current physical evidence in another, making it clear which amount is actually attached to an offered reel.
- Use one current-footage field per reel with measured, documented or estimated basis.
- Keep dimensions and weight basis separate from footage.
- Do not aggregate several cut pieces into one continuous length.
Document condition and release without making technical claims
Separate uninstalled stock from material removed from service. Record known storage history, visible jacket damage, end protection and known moisture exposure. Photographs of accessible ends and the reel help document visible facts, but they do not establish electrical performance or reuse suitability. When exposure or end protection is unknown, say so plainly.
Add the inventory owner or authorized release contact, storage location, access constraints and any approval still pending. These facts define what can be discussed for the lot. They do not promise movement, freight, timing or acceptance. Keeping them alongside the reel record avoids the different error of treating a project closeout file as an automatic release authorization.
- Mark uninstalled, removed or unknown status for each reel.
- Record visible condition and known storage facts without a performance conclusion.
- List owner or release contact, location, access constraints and approval status separately.
Place Arlington project context in its limited role
Arlington Public Works lists capital projects involving sidewalks, streetlights, drainage, sanitary sewer, waterline replacement and roadway capacity improvements.
That list is a local project-context fact, not proof that any project produced available cable. An illustrative inventory example—not a purchased lot: UD-ARL-02; distribution designation photographed on tag; neutral configuration unknown; 580 ft documented; warehouse reel; exposed end protection unknown; gross weight includes packaging. The record preserves the physical facts and the unresolved fields separately.
- Submit tag and jacket photos, a reel-by-reel table and any project records that can be matched to a reel ID.
- Retain unknown configuration or current-balance fields as unknown.
- Identify the release path without treating it as an agreed transport plan.