Capture the marked construction on each reel
An underground-project description is not a cable specification. Photograph the reel tag and readable jacket marking, then transcribe the manufacturer, designation, conductor material and size, marked voltage, and neutral or shield details that the evidence supports. Keep the record with the physical reel reference rather than describing several reels under one project name.
If a marking cannot be read, say so. Do not infer voltage or neutral configuration from cable diameter, a nearby reel, or the job name. The error to avoid is treating “underground project cable” as proof that every offered reel has one voltage class and construction.
- Reel reference and manufacturer
- Exact designation and marked voltage
- Conductor material and size
- Neutral or shield details, or an explicit unknown
Match documents to the exact physical reel
For every data sheet, project record, invoice, or report, record the document ID, batch or lot ID when available, record date, and match status. A document only supports the offered reel when its identifiers actually link to that reel. If the file belongs to a different batch or cannot be matched, retain it as background and mark the specification fields unverified for the offered line.
This record protects the distinction between documented construction and an unconfirmed similarity. Do not borrow details from a matching-looking reel or assume that every document in a project folder applies to all remaining cable.
- Reel ID and document ID
- Batch or lot reference when available
- Record date and match status
- Discrepancies retained rather than overwritten
Record present length, ends, and storage condition
List the continuous length of each reel and label the basis as measured, documented, estimated, or unknown. Describe accessible end protection, known moisture exposure, storage history, and visible damage. These are inventory facts; they are not an electrical-condition conclusion. Gross reel weight, when supplied, should remain separate from cable length and construction.
When a reel has partial evidence, keep it as its own line. A missing end photograph or unknown storage history is a useful limitation to record, not a reason to merge it with an identified reel. This keeps condition questions attached to the right material.
- Continuous length with evidence basis
- End-protection and visible-damage notes
- Known moisture exposure and storage history
- Gross weight labeled separately when reported
Add Carrollton release and access context
The City of Carrollton says its Public Works Department maintains the city’s surface and underground infrastructure, including streets, drainage, water and wastewater.
That municipal fact can be relevant background when a contractor describes why a distribution-cable record exists, but it does not identify city-owned material, a public-works customer, or a lot for sale. For the actual reel, state the authorized release role, storage location, access limits, available loading resources, and seller’s requested timetable.
- Release authority for the offered reel
- Actual storage location
- Access limits and available loading resources
- Project background kept separate from cable evidence
Use a reel-level illustrative record
A good example preserves the boundary between documented facts and pending details. It lets the seller submit a partial record without declaring a uniform construction for other reels in the project. The example is fictional and is not evidence of a customer, job, or purchase.
Illustrative inventory record—not a purchased lot: UD-CAR-02; distribution designation from reel tag; 15 kV marking photographed; neutral configuration pending; 580 ft documented; gross weight includes packaging. The pending neutral detail stays with this reel and is not filled from another project document.