Move from project label to marked construction
Copy the complete designation, conductor material and size, marked voltage, and documented neutral or shield configuration from the reel or matching record. “Underground” describes a use context, not a complete product specification, and adjacent reels can have different voltage or construction details.
If a neutral, shield, or configuration cannot be confirmed, mark it unknown or pending rather than deriving it from another project reel. This retains the difference between a verified product field and a follow-up item.
- Use the reel tag or jacket legend as the construction source.
- Keep conductor size, voltage, and configuration in separate fields.
- Do not use the project name as a substitute for a cable designation.
Create a reel-by-reel quantity and handling record
Give every reel an ID and record its continuous length, diameter or dimensions when available, and weight basis. Label footage and weight as documented, measured, estimated, or unknown. A total footage figure without the reel-level breakdown can hide both length and handling differences.
Do not combine a full reel with a partial reel merely because their product descriptions appear similar. Keep reel count, individual length, and the source of each quantity connected to the same inventory reference.
- List one row per reel or truly identical documented group.
- Distinguish gross, net, estimated, and unknown weight.
- Preserve individual continuous lengths rather than an aggregate only.
Document ends, storage, and visible condition
Photograph accessible cable ends, printing, reel flanges, and visible condition. Note known moisture exposure, missing end protection, packaging condition, or storage limitations without claiming more than the record shows. An image documents what is visible; it does not establish a condition certification.
Where a reel end is inaccessible or storage history is missing, state that directly. Link the photo set to the reel ID so a known limitation on one reel is not silently applied to the entire inventory.
- Record end protection as present, missing, or unknown.
- Describe storage history only to the extent it is known.
- Use photo filenames that match the reel ID.
Keep release details alongside the physical reel
State the storage location, the person or role able to authorize release, and seller-reported access or loading constraints. These fields make a handoff record practical while leaving transaction terms to the individual lot discussion.
If a project record lists cable that cannot yet be released, retain it on a pending line rather than adding it to available quantity. The inventory should distinguish cable that is physically present from cable that is merely referenced in project paperwork.
- Identify release authority or mark it pending.
- State access limits and available seller-reported handling resources.
- Separate pending project material from currently offered reels.
Use the local policy fact as context, not a lot claim
The City says its large-electric-user policies require customers to fund associated infrastructure such as substation transformers, utility lines and switchgear.
That policy context may explain why infrastructure records exist, but it does not prove the type, ownership, availability, or purchase of any Georgetown reel. The source-supported task is still a documented reel-by-reel handoff for the material actually offered.
- Keep project records matched to the actual reel number.
- Mark unknown configuration and end-condition fields clearly.
- Submit the reel record with the quote request for lot-specific discussion.