Carry complete construction through the handoff
Transcribe the manufacturer and designation, conductor material and size, printed voltage, insulation, and neutral or shield configuration from each reel or a matching product record. Keep these fields on the reel line; do not let a project name stand in for construction. A tag that says only underground project cable is context, not a complete description.
If a neutral, shield, size, or voltage field cannot be confirmed, mark it unknown. Keep a product record that does not identify the reel as a separate reference rather than using it to finish the line.
- Manufacturer and complete designation
- Conductor material, size, and printed voltage
- Insulation and neutral or shield configuration
Make the reel handoff record auditable
Assign a unique reel ID, retain the source project or warehouse reference, and record current continuous length, reel count, and quantity basis. Split multiple reels from the same project into individual records so a seller does not lose the link between construction and the physical item.
Where length is not available, state unknown instead of replacing it with an aggregate project quantity. Reel dimensions and an explicit gross or other weight basis can still be recorded as observations, without presenting them as an exact footage conversion.
- Reel ID and source project or warehouse
- Continuous length and quantity basis
- Reel dimensions and stated weight basis when known
Describe condition without borrowing it from another reel
Note visible end condition, moisture exposure if known, packaging, flange condition, and visible jacket damage on the individual reel. If a reported weight includes packaging, pallet, or blocking, label it gross. Do not assume the condition of one reel proves the condition of another stored beside it.
Photographs should match the reel ID and show the readable tag or marking when available, a whole-reel view, and the visible condition point being described. If a field cannot be observed, record the limitation plainly.
- End condition, moisture exposure, and visible damage
- Gross or other weight basis
- Photo references matched to the reel ID
Keep release and site facts with the reel
State whether the material is uninstalled, removed, or still under project control; identify the person or role that can authorize release; and list seller-provided access limits. A warehouse location does not by itself establish ownership or permission to release a reel.
The City’s Private Utility Projects page says its Permits and Inspections Division coordinates private-utility projects in the right-of-way, while private-property work occurs in existing easements or by property-owner agreement. This limited local context supports asking sellers to retain right-of-way, easement, access, and release facts when they apply. It does not say that a particular project, utility, or property has distribution cable available.
- Condition status and release authority
- Site approval status or unknown
- Access limits and known loading information
Use a per-reel example when fields are incomplete
Illustrative inventory example—not a purchased lot: reference UD-ALEX-04; construction distribution designation from tag with neutral configuration pending; quantity 580 ft documented, warehouse reel; weight gross weight includes packaging. The record is a format example, not a description of an actual transaction or a promise of purchase.
The record error to avoid is labeling an item only as underground project cable and using the project name for voltage, configuration, or present reel quantity. Split the inventory by matching records, preserve per-reel evidence, and leave missing construction or quantity fields unknown.
- Do not replace a missing field with a project description
- Keep each reel’s unknown fields attached to its reference