Capture the marked rating at the reel
Photograph and transcribe the kV marking, manufacturer, part number, conductor size, and conductor metal from the offered reel or cable jacket. Preserve insulation, shield, neutral, and jacket details only when they appear in the marking or in a document that can be linked to this item.
A project title, a similar-looking reel, or a general voltage label cannot fill a missing field. Keep unknown construction details explicit so the record shows exactly what is documented and what still needs an item-specific source.
- Marked kV
- Manufacturer and part number
- Conductor size and metal
- Insulation, shield, neutral, and jacket fields
Link documents to one reel or batch
For every production, batch, or existing test record, capture the reel ID, lot or batch ID, date, and stated scope. Attach it only to the row it identifies. A report that names another batch can be useful background, but it must not be represented as evidence for the offered reel.
If a document has no reel ID, state that limitation and keep it separate until a credible item-to-record connection is available. This traceability step is the central decision for medium-voltage inventory, not an optional paperwork exercise.
- Reel ID
- Batch or lot ID
- Record date
- Record scope and any mismatch
Describe physical record facts without a fitness claim
List remaining continuous length, the quantity basis, accessible end protection, visible jacket or reel condition, and known storage exposure. Include dimensions and the basis for any recorded weight when they are available. These facts support an inventory discussion; they do not certify performance or suitability.
If a reel has a missing end cap or a faded legend, photograph the condition and write it in the row. Do not replace the missing insulation or rating field with an assumption based on nearby stock.
- Continuous length and quantity basis
- End protection status
- Storage history and visible condition
- Dimensions and stated weight basis
Keep infrastructure context proportionate
The Town says its water investments include eight new well sites and reconstruction of the North Water Treatment Plant; the plant is described as producing up to 45 million gallons per day. The statement does not identify an offered cable reel, a buyer relationship, or any demand. Its limited relevance is that utility or facility-related inventory benefits from preserving exact reel and record traceability rather than relying on a project description.
For the seller’s list, the actionable local detail is still the actual storage location, access constraints, and release authority for the reel in hand. Those fields should remain separate from the product rating and its supporting documents.
- Source context kept separate from inventory identity
- Actual location and access
- Release authority or pending status
Worked reel record and unresolved links
An illustrative row can read: MV-GIL-05; 15 kV marking photographed; 720 ft documented; uninstalled reel; one missing end cap; no matching test record; insulation level unknown. It identifies useful facts without turning a record gap into a claim about the cable.
If a report only matches a different batch, leave it outside the item’s evidence column and flag the missing match. The remedy is a reel-level record link, not a copied specification from a similar reel.
- Illustrative entry shows both documentation and gaps
- Record mismatch stays visible
- No document is treated as a fitness conclusion