Capture the marked rating from the offered reel
Start with a reel reference and a clear photograph of the actual kV marking, manufacturer, and part number. Then record conductor metal and size, insulation designation or level when known, shield or neutral construction, and the full product designation. A project name, equipment description, or similar-looking reel is not a substitute for the marking on the cable being listed.
If a label is weathered or partly absent, transcribe only what is readable and flag the rest as unknown. Keep an unreadable field in the record instead of assigning a likely kV or insulation system from another item.
- Marked kV, manufacturer, part number, and reel ID.
- Conductor, insulation, shield or neutral, and product designation.
- Photograph the actual label or jacket area for each reel.
Match production and existing test records by identifier
For every file supplied with a reel, record the reel ID or batch or production ID, the document date, the scope of the document, and whether the match is exact, partial, or not found. An existing test report can be retained as a record, but it must not be represented as applying to a different batch or reel.
The specific mistake is assigning a project’s kV or another batch’s record to a matching-looking reel. Correct it by leaving the rating or record relationship explicit: if no document matches, say no matching record located and preserve only the evidence that does match.
- Batch or production ID.
- Record date and record scope.
- Exact, partial, or no-match status.
- Reel-specific photo reference.
Describe visible condition without a fitness claim
Record continuous length with its basis and describe observable end protection, visible exposure, storage history, dimensions, and documented weight basis. These observations help distinguish reels without certifying electrical condition, performance, or suitability for a new use.
A missing end cap, incomplete storage history, or uncertain exposure should remain in the record. The useful action is to show the accessible condition and label the unknowns, not to turn a visual observation into a conclusion about the inside of the cable.
- Continuous length and quantity basis.
- End protection and visible exposure.
- Storage history, dimensions, and weight basis.
- Site access information.
Keep access and release facts with the reel
For each storage group, identify the site location, access restrictions, available loading equipment if known, and the person or role able to authorize release. Keep those fields with the reel reference rather than a generic site note, especially where more than one cable group is present.
If an item has incomplete handling data, state the missing field and the source that might clarify it. This preserves a practical inventory record without assuming inspection, transport, acceptance, or timing terms.
- Storage location or site group.
- Access restrictions.
- Known loading equipment.
- Release authority or pending status.
Illustrative MV record and regional scope
Illustrative only—not a purchased lot: MV-SL-03 shows a photographed 15 kV marking, 720 ft documented continuous, one missing end cap, and no matching batch or test record located. Insulation level is unknown. The value of the record is that its known and unknown fields refer to the same reel.
EBMUD says the Upper San Leandro Water Treatment Plant at 7700 Greenly Drive in Oakland serves San Leandro and neighboring communities. That regional utility fact does not identify the source, owner, construction, or availability of any cable. It is limited context for why a utility-related description must still be supported by reel-specific markings and records.
- Link every record to an actual reel or batch ID.
- State missing end protection and record gaps plainly.
- Do not infer kV from project context.
