Use the reel marking, not the project title
Photograph and transcribe the manufacturer designation, conductor material and size, and marked voltage from every reel. Keep the readable jacket legend and tag tied to the same reel reference. A public project description or internal job name may supply background, but it cannot establish the cable’s construction, ownership, or remaining length.
If a field is unreadable or absent, label it unknown. Do not borrow a voltage or designation from a nearby reel. The goal is a project-to-sale handoff in which every product fact can be followed back to the offered material.
- Manufacturer and exact designation.
- Conductor material and size.
- Marked voltage.
- Reel reference matched to tag and jacket image.
Preserve neutral and shield configuration
Record neutral, shield, insulation, and other configuration details only from a matching product record or the reel’s actual legend. Include the document ID that links the information to the reel. Distribution products with similar outside appearance can carry different configurations, so one record should not be applied to another item by proximity.
When a configuration detail is pending, state precisely what is unknown. Split reels where the known construction differs. This allows a seller to submit a useful record without silently inventing neutral or shield information.
- Neutral detail.
- Shield or configuration detail.
- Insulation designation.
- Matching record ID for the same reel.
Build a reel-by-reel quantity and condition record
List every reel’s continuous footage, dimensions, weight basis, and end condition. Mark footage as measured, documented, estimated, or unknown. Distinguish gross, net, and unknown weight rather than treating a packaging-inclusive figure as a cable-only value.
State whether the reel is uninstalled stock or previously used material, then add storage location, release authority, access limits, and known loading resources. These fields describe the actual handoff record; they do not assume any movement, terms, or acceptance.
- Footage per reel and quantity basis.
- Dimensions and gross, net, or unknown weight basis.
- End condition and condition/history.
- Storage location, release authority, and access limit.
Keep the city source in its correct role
The City’s utilities project page describes downtown work replacing or upsizing approximately 10,000 feet of water pipeline and 4,000 feet of sewer pipeline, plus a 48-inch parallel sewer replacement along Leisure Town Road for future peak flows. It can provide limited infrastructure context for a changed-scope or contractor inventory example, but it does not identify electrical cable, prove a seller owns material, or establish a particular reel’s voltage.
The offer record must instead rely on seller-held tag images, product records, quantity information, custody or release details, and location facts. Treat the public source as context, never as a substitute for a reel-level record.
- Public project scope is not product evidence.
- Use seller records for ownership and release.
- Keep voltage and configuration tied to the actual reel.
Worked distribution record and incomplete fields
Illustrative fictional inventory record — not an actual or purchased lot: UD-VV-01 has a distribution designation copied from the tag, neutral configuration pending, 580 ft documented, and a gross weight that includes packaging. It is listed as an uninstalled warehouse reel with release authority unknown.
The common mistake is using a public project description as proof of the offered cable type, voltage, or ownership. Correct it by retaining the actual reel marking, separating different constructions, and identifying the precise missing record rather than completing it from the project narrative.
- Example reference: UD-VV-01.
- Product: designation from tag; neutral configuration pending.
- Quantity: 580 ft documented; gross weight includes packaging.
- Release authority: unknown.
