Draw a clear boundary around what is actually offered
Begin by marking which physical reels, boxes, and cables are included in the inquiry today. Keep items reserved for future work, pending return, held for approval, or not located physically in separate categories. An inventory export can be useful background, but it is not the offered boundary unless every line has been checked against the material that remains.
Give every offered item an inventory reference and connect it to its current status. A line can say approval pending or quantity unverified without being discarded; it simply should not be counted as ready inventory. This prevents a buying discussion from starting with material that the seller cannot yet release.
- Separate offered, reserved, pending, and unverified items.
- Use one reference for each reel or package.
- Keep the offered total limited to items the seller has identified as available.
Reconcile the old record to the reel in storage
For each physical item, compare the purchase order, project record, or warehouse export with the tag or package in front of you. Record the part number or designation, original quantity, current quantity, and the basis for any difference. A discrepancy may be explained by a partial reel, returned material, consumption, or a record that has not been updated; state the known explanation rather than repeating the old number.
This page is not a generic inventory guide. Its specific seller task is making the current balance traceable before it is presented as surplus. If a reel cannot be located or a record does not match the tag, put that exception on its own line and describe what would be needed to reconcile it.
- Keep original and current quantities in separate fields.
- Link discrepancies to a stated basis or leave the basis unknown.
- Do not let an old invoice stand in for a physical count.
Preserve the differences between full, partial, and boxed stock
List full reels, partial reels, unopened boxes, and shorter pieces separately. For each reel or package, state the current continuous footage and whether it is measured, documented, or estimated. Several short lengths are not the same inventory record as one long reel, so do not convert an aggregate total into a claimed continuous length.
Add observable condition and storage notes, such as uninstalled status, damaged packaging, missing tags, or visible exposure. A weight can assist with a handling conversation only if its basis is named; gross loaded-reel weight is not a substitute for product identity or continuous footage.
- State the quantity basis beside each continuous-footage value.
- Keep package ID and reel status together.
- Record visible condition without claiming electrical performance.
Keep release authority and access visible with the balance
A current balance is useful only if the seller also identifies who can authorize the sale and release. For each location, state the owner or authorized contact when known, storage location type, access limits, and loading resources. These details describe the lot; they do not schedule a collection or establish transport terms.
The City of Savannah publishes semi-annual Capital Improvement Program reports and links to a Savannah Under Construction map. That is limited context for a seller explaining why a project record exists. It does not identify city-owned inventory, verify current footage, or establish that a project-listed cable reel can be sold.
- Name the release authority or flag the line as pending.
- Keep access details with the location of the item.
- Do not count pending stock in the offered balance.
Fix the invoice-total mistake with a current-balance record
The common mistake is presenting original invoice footage as the remaining quantity for a mixed overrun lot. Correct it by creating a line for each physical reference, separating reserved and pending stock, and explaining the evidence basis for current footage. If a reel is missing its tag or has not been measured, write that clearly rather than borrowing another item’s information.
Illustrative inventory example—not a purchased lot: OV-SAV-11 is fictional project-overrun feeder cable with a part number on its tag. It has two documented continuous lengths, 300 ft and 180 ft, on separate reels; condition is uninstalled, and approval is pending. The fictional example shows why a pending release does not belong in a final offered total.
A City report may help a seller remember the project context, but the usable record is the physical inventory reference, its current balance, its evidence basis, and the release status.