Use the project record as background, not the product label
Begin with a project reference only to explain why the material became excess. Then create a physical reel line and transcribe the manufacturer, part number, and full designation from the reel tag, jacket printing, or a matching product record. A project title does not establish the conductor configuration, rated voltage, or exact item in front of you.
If the project paperwork and reel record do not align, keep both but identify the mismatch. Do not assign an order specification to every reel in a group. This handoff task is about retaining what the individual reel actually says so the buyer can review an accurate distribution-cable description.
- Keep project reference in a separate field from the cable designation.
- Match any product record by part number, reel, or other stated identifier.
- Write unknown when a tag, marking, or record is missing.
Capture the construction fields that distinguish distribution reels
Copy the marked voltage and the conductor metal and size for each reel. Record neutral or shield details, configuration, and end protection on the same line. An underground-use description alone is too broad: similar looking reels can differ in conductor count, neutral arrangement, insulation, or marked rating.
Photographs should show the readable tag, jacket legend, reel face, accessible ends, and visible condition where safely available. The photographs document what can be seen; they do not substitute for a product record or make a statement about electrical performance. When one field cannot be confirmed, leave only that field unknown rather than making the entire inventory unusable.
- Record the voltage exactly as marked.
- Keep neutral or shield details with the matching reel.
- State the end condition as observed, including missing protection.
Reconcile original footage to the balance that remains
Compare the original order or project list with the current reel in storage. For each reel, enter the reel ID, current continuous footage, number of matching reels, and the quantity basis. A measured balance, documented balance, and estimate are different records and should be named as such. If you use a dimension or weight to estimate length, describe that basis rather than implying a precise measurement.
Separate full reels, partial reels, and shorter pieces. Do not present an original project total as current available footage, and do not add separate continuous lengths together as though they were one unbroken run. Include gross, net, or estimated weight only when its basis is clear.
- Show original order quantity and current balance in different fields.
- Give each reel its own continuous-footage value.
- Label any weight as gross, net, or estimated.
State condition, release, and access without assuming a transaction
Record whether the cable is described as unused, removed intact, or unknown, along with known storage history and visible end condition. Do not turn those observations into a claim about suitability. Next, identify who owns the material or can authorize a sale, the storage location type, access limitations, and loading resources if known.
Savannah Water and Sewer Planning and Engineering manages water and sewer capital-improvement projects, conducts utility plan reviews, and maintains an inventory of water and wastewater systems. That fact explains a municipal project context only. It does not show that the City owns, sells, specifies, or has released any cable; seller-provided reel evidence remains the basis for a buying discussion.
- Name the release authority or write it as pending or unknown.
- Keep storage history and visible condition separate from the product designation.
- Describe access limits with the applicable location rather than the whole project.
Correct an order-only listing with an honest reel handoff
The common error is a list that contains a project name and original footage but no marked construction or current balance. Repair it by splitting the list reel by reel, attaching photographs to the same references, and showing the current quantity with its basis. Any missing voltage, configuration, or release field should remain visible as unknown until the seller can confirm it.
Illustrative inventory example—not a purchased lot: UD-SAV-03 is a fictional warehouse reel with a distribution designation copied from its tag, a neutral configuration pending, and 580 ft documented. Its gross weight includes packaging, and unused versus removed status is unknown. This is not a claim about an actual lot; it demonstrates a practical record that identifies what is known without inventing the missing fields.
The City of Savannah publishes semi-annual Capital Improvement Program reports and links to a Savannah Under Construction map. Those public materials can explain project context, but a report listing is not evidence that a specific reel is available or authorized for sale.
