Record the actual designation
Transcribe the printed jacket marking exactly as it appears: TC, TC-ER, PLTC, or any manufacturer code. If a manufacturer part number or a voltage/data-sheet reference is visible, link that text to the same line. This is the primary attribute for distinguishing one construction from another.
When the marking is partially obscured or worn, note the exact visible substring and mark the designation as "partial"; pair that with photos that show the marking area and any adjacent readable text. Do not infer a full designation from appearance alone — preserve what you can read.
- Required evidence fields: printed designation, manufacturer/part number, voltage marking, data-sheet reference
- If a data sheet is available, attach the reference text or part number to the same record
Split construction variants into separate lines
Keep different conductor counts, pair counts, gauges, shielding, jacket types, and fitted ends on separate inventory lines even if reels or runs look similar. Visual similarity can mask significant electrical and commercial differences.
For each line, record conductor/pair count, AWG gauge, type of shielding (foil, braid, combination, or none), jacket material and color, and whether fitted ends or terminations are present.
- Required evidence fields: conductor/pair count, gauge, shielding, jacket and ends
- One inventory row should represent one distinct construction and its continuous footage basis
Preserve quantity and history with a clear basis
Record continuous footage per reel or continuous run and state how the footage was established: measured, documented (label or ticket), or estimated. Do not collapse multiple reels with different evidence into one total.
Capture the material condition and history: uninstalled stock, project overrun, or removed material. Note fitted ends, splices, and any visible damage separately on the record so reviewers can judge usability and risk.
- Required evidence fields: reel/reference, continuous footage, quantity basis, condition/history
- When footage is estimated, describe the method used (wheel-measure, reel tag, visual count) and attach photos of the reel identification
Tie photos and tags to each release line
Match each photo to a specific inventory line: include a close-up of the jacket marking, a reel overview showing tag and coiling, and images of visible damage. Record the photo reference code on the same line.
Document site or access details and release authority for each lot. Treat photos and release notes as provenance — not as electrical testing. Do not interpret photos to replace written marking or manufacturer documentation.
The port’s official fast facts list agricultural, forestry and petrochemical markets and cargo including pipe, steel, plastics, liquid bulk chemicals, grain and forest products. This is bounded industrial context only and does not identify any local inventory. For a control or tray cable submission, the decisive information remains the marked construction, distinct line item, quantity basis, condition history and release details.
- Required evidence fields: photo reference, visible condition, site/access, release authority
- Photograph tag numbers and any attached paperwork in the same frame as the jacket marking when possible
Handling unknown or incomplete inventory
If printed markings are illegible or absent, keep that material on a separately labeled line marked "designation unknown" and provide the best-available evidence: measured conductor count, gauge, shielding observed, and photos of the jacket and ends.
Do not merge unknown-designation reels with identified reels. Instead provide an explicit note of uncertainty and the steps taken to attempt identification, such as checking reel tags and existing paperwork so reviewers know the material’s provenance and remaining questions.
- Document the quantity basis (measured, ticketed, estimated) and any constraints on verification
- Provide honest disclosure of unknowns rather than combining quantities into a single total