Why per-reel records matter
A single aggregate footage and one representative reel photo do not let a reviewer verify a mixed multi-site inventory. When lots span locations or include visually similar products, auditors and buyers need a one-to-one trace from spreadsheet line to reel, photo, and site.
Follow the brief’s steps: assign stable line references reused across your spreadsheet, photo filenames, and any paperwork; record footage per reel and the basis for that quantity; and identify the exact site and release contact for each reel. This preserves differences in condition, quantity basis (documented versus estimated), and access requirements so a reviewer can make reliable decisions.
- Prevent mismatches between listed totals and on-site inventory by keeping one row per reel or continuous piece.
- Tie each photo to the exact line reference and note if footage is measured, documented, or estimated.
- Record loading equipment and access restrictions per site so release authority and pickup planning are verifiable.
Step-by-step checklist for multi-reel lots
Assign stable line references: create a short code for each reel or identical group and reuse it in the spreadsheet, photo filenames, and any release documents. Required evidence fields include line/reel reference, manufacturer, part number, and designation.
Preserve per-reel quantity: list reel count and continuous footage for every reel. Record whether footage is documented (ticketed), measured, or estimated and include condition notes. Required evidence fields: reel count, footage per reel, quantity basis, and condition.
Group by actual site: separate storage locations and list site/address, release contact, access restriction, and loading equipment. Note whether lots can be released together or need separate authority.
Match the photo set: provide images showing tag or jacket printing, an overview establishing scale, and close-ups of any visible damage and end protection. Tie photo references directly to line entries and disclose exceptions.
- Use consistent filenames: e.g., BL-STL-01_overview.jpg, BL-STL-01_tag.jpg, BL-STL-01_end.jpg.
- Mark estimated footage clearly and keep a documented status column to avoid confusion with ticketed counts.
- When reels share a designation but differ in footage or condition, list them on separate rows.
What to do with unknown or incomplete inventory
If footage, tag data, or site details are unknown, be explicit. Use the quantity-basis field to state 'estimated' or 'unverified' and attach the best available photo showing identifying markings and overall condition. Do not collapse unknowns into a single grand total.
Provide the release contact and note any known access restrictions even when inventory is incomplete. If a reel’s conductor weight or exact footage is unknown, record the gross loaded-reel weight basis and mark conductor weight as unknown; this preserves auditability and directs follow-up measurements.
When inventory is spread across multiple sites and you do not control release authority everywhere, list the site-specific release contact and whether separate authorization will be required. If you cannot confirm whether multiple sites can be handled in one transaction, mark that as a business confirmation item and provide the best contact information available.
- Do not substitute a single total for incomplete per-reel entries; use one row per reel with a clear quantity-basis flag.
- Flag items requiring on-site verification and specify what verification is needed (footage, tag, or weight).
- Keep photos tied to rows so an independent reviewer can see the condition claimed for each reel.
Common mistake and concrete resolution
The repeated mistake: describing a mixed, multi-site inventory with one aggregate footage and one clean reel photo. That approach hides differences in location, condition, and quantity basis and prevents accurate review.
Concrete resolution: create one spreadsheet row per reel or continuous piece; attach the exact photo set to that row; preserve site, condition, and quantity differences even when products look similar. Use stable line references and include required evidence fields listed in the seller task so any reviewer can match lines to physical items.
- Example corrective action: split a combined line into BL-STL-01 and BL-STL-02, attach photos for each, note Site A vs Site B, and mark footage as documented (500 ft) versus estimated (90 ft).
- Keep a gross loaded-reel weight column if conductor weight is unknown and state that conductor weight remains unmeasured.
Illustrative record (do not treat as a purchased lot)
Use the supplied illustrative example as a template for your submission. It demonstrates one row per reel, site separation, and a weight note when conductor weight is unknown.
Fill the same fields in your real inventory spreadsheet and attach photos named to match the line/reel reference so reviewers can confirm the match without ambiguity.
- Illustrative example fields: line A — BL-STL-01; matching product; Site A; 1 reel, 500 ft documented.
- Line B — BL-STL-02; same designation; Site B; 1 reel, 90 ft estimated; weight — gross loaded-reel weight basis recorded; conductor weight unknown.
Using city facility facts for logistics reference
If reels are located at or near municipal facilities, preserve the exact approved facts rather than paraphrasing them. The Municipal River Terminal fact and the public-infrastructure description are preserved in the evidence ledger to help reviewers locate potential site attributes; they are not independent proof of a lot.
The Port Authority describes its Municipal River Terminal as having a 2,000-foot dock, 40-acre yard, rail spur and 90,000-square-foot warehouse. This public terminal description is logistics context only, not evidence that any cable is stored there. A seller’s own reel dimensions, weight basis, site grouping, and access restrictions are the facts needed for a specific lot.
- Preserved fact: The Municipal River Terminal is described as having a 2,000-foot dock, 40-acre yard, rail spur and 90,000-square-foot warehouse.
- Preserved fact: The public-infrastructure page lists capital-improvement and traffic and lighting maintenance responsibilities.
