What we need first: marked construction photographed and transcribed
Start by capturing the exact designation shown on each reel tag or label and transcribe it verbatim. Include conductor material and size (for example, CU 3/0, AL 300 kcmil) and any part number printed on the tag or shipping document. If multiple tags exist for a reel, photograph and transcribe each and note differences.
Preserving the marked voltage is essential: photograph any printed or stamped voltage ratings and repeat the exact text in your submission. If a tag shows a nominal voltage range (e.g., 5 kV-15 kV), record that full string rather than an interpretation.
Macon-Bibb County says Middle Georgia Regional Airport is receiving $4,012,500 in Georgia Department of Transportation grants for T-hangars, a box hangar and an East Drive extension; the East Drive work is intended to provide access and utilities to an area for future development. The announcement does not identify a cable specification or an available lot. Its narrow relevance is that a seller with project-context records should still preserve the specific reel tag, configuration and release evidence.
- Evidence fields to provide here: designation, conductor material/size, marked voltage, part number
- If a field is unknown on the reel tag, mark it explicitly as unknown rather than guessing
Preserve configuration: neutral, shield and assembly details from tags/documents only
Record neutral and shield details only when they appear on the physical tag, packing list, splice card, or other matching project document. Do not infer the presence or size of a neutral or shield from the project scope; record what the reel tag says and capture a photograph.
Where assembly or conductor grouping details are printed (for example, 3/C + N, concentric neutral, shielded), copy the exact phrasing and link it to the photographed tag or the document reference number.
- Evidence fields: neutral, shield, assembly details, record reference
- When the reel tag omits neutral or shield information, mark those fields unknown and include any adjacent documentation that might clarify
Reconcile quantities per reel: footage, dimensions and weight basis
List each reel with a unique reel ID from the tag or assign a locally consistent ID and note that it is assigned. For every reel provide continuous footage, physical dimensions (diameter and flange width), and whether the listed weight is gross, net, or an estimate.
Distinguish documented balances from estimated lengths. If a reel tag states 580 ft documented, record it as documented footage. If the remaining footage is calculated from weight, mark that as an estimated value and state the weight basis used for the estimate.
- Evidence fields: reel ID, continuous footage, dimensions, weight basis, end protection
- Photograph end protection (caps, blocking) and include those images with the reel record
Confirm handoff authority and site access
Identify who is authorized to release each reel. Capture the name, role, and any written release authorization shown on a release form or tag. Note that a project name alone does not authorize movement — we need an explicit release authority.
Describe storage location, access restrictions (gate hours, security check-in), and available loading resources at the site. If the site requires a scheduled escort or special equipment, record that as an access restriction rather than an assumption.
- Evidence fields: release authority, storage location, access restrictions, loading resources
- If release authority is not present or the record is ambiguous, mark release authority unknown and keep that uncertainty visible until the site owner confirms it
How to handle unknown or incomplete inventory details
When records omit key fields (for example neutral or part number), preserve the project-level description as context and explicitly label reel-level fields as unknown. Then split the inventory into units that match observed specifications rather than merging everything into a single assumed construction.
For any reel with incomplete data, provide the photographed evidence and a short note of the next recommended action: seek the tag issuer, request the original packing list, or perform an inventory measurement that does not alter the product. Our review begins from recorded facts; unknowns must remain explicit.
- Mistake to avoid: treating all underground project cable as a single uniform construction
- Resolution: split inventory by matching specifications and keep unknown fields explicit
Illustrative record format (example only)
Provide an itemized reel record similar to the illustrative record below so reviewers can quickly assess traceability. This example is illustrative only and not a purchased lot.
Include the line identifier, transcribed designation, configuration notes, documented quantity, and whether the weight is gross or net. Keep photographs and document references attached to each reel record.
- Illustrative only — not a purchased lot: line UD-MB-01; designation = distribution designation from tag; exact value unknown; configuration = neutral pending; marked voltage photographed; quantity = 580 ft documented; weight = gross includes packaging